Gold CIP and CIL process optimization in a capital constraint environment

dc.contributor.authorSnyders, C. A.en_ZA
dc.contributor.authorAkdogan, G.en_ZA
dc.contributor.authorBradshaw, S. M.en_ZA
dc.contributor.authorVan Wyk, A. P.en_ZA
dc.date.accessioned2019-02-19T06:29:19Z
dc.date.available2019-02-19T06:29:19Z
dc.date.issued2017-05
dc.descriptionCITATION: Snyders, C. A., et al. 2017. Gold CIP and CIL process optimization in a capital constraint environment. Journal of the Southern African Institute of Mining and Metallurgy, 117(8):819-828, doi:10.17159/2411-9717/2017/v117n8a13.
dc.descriptionThe original publication is available at http://www.saimm.co.za
dc.description.abstractENGLISH ABSTRACT: This article focuses on the use of a model in combination with economic analysis to extract maximum value out of current gold operations, without the need for additional capital. Two South African case studies (CIP and CIL) are presented to show that an optimum point of operation exists. This optimum point of operation, however, depends on several economic factors such as the gold price, exchange rate, and utility costs in combination with plant conditions such as the feed rate and Au grade. As these parameters fluctuate, the operating conditions will have to be adjusted to achieve the maximum value. Operating at a maximum will require regular decisionmaking and adjusting of operating conditions, especially in times of a constrained economy.en_ZA
dc.description.urihttps://www.saimm.co.za/publications/journal-papers/details/1/6405
dc.description.versionPublisher's version
dc.format.extent10 pages : illustrationsen_ZA
dc.identifier.citationSnyders, C. A., et al. 2017. Gold CIP and CIL process optimization in a capital constraint environment. Journal of the Southern African Institute of Mining and Metallurgy, 117(8):819-828, doi:10.17159/2411-9717/2017/v117n8a13
dc.identifier.issn2411-9717 (online)
dc.identifier.issn2225-6253 (print)
dc.identifier.otherdoi:10.17159/2411-9717/2017/v117n8a13
dc.identifier.urihttp://hdl.handle.net/10019.1/105434
dc.language.isoen_ZAen_ZA
dc.publisherThe Southern African Institute of Mining and Metallurgyen_ZA
dc.rights.holderThe Southern African Institute of Mining and Metallurgyen_ZA
dc.subjectGold recoveryen_ZA
dc.subjectEconomic aspects -- Analysisen_ZA
dc.subjectRobust optimizationen_ZA
dc.titleGold CIP and CIL process optimization in a capital constraint environmenten_ZA
dc.typeArticleen_ZA
Files
Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
snyders_gold_2017.pdf
Size:
1.07 MB
Format:
Adobe Portable Document Format
Description:
Download article
License bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed upon to submission
Description: