Shift scheduling for a maintenance workshop

dc.contributor.authorSinclair, M.en_ZA
dc.contributor.authorMuller, L.en_ZA
dc.date.accessioned2012-10-24T06:36:15Z
dc.date.available2012-10-24T06:36:15Z
dc.date.issued1990
dc.descriptionCITATION: Sinclair, M. & Muller, L. 1990. Shift scheduling for a maintenance workshop. South African Journal of Industrial Engineering, 4(1):18-29, doi:http://dx.doi.org/10.7166/4-1-432.
dc.descriptionThe original publication is available at http://sajie.journals.ac.za
dc.description.abstractENGLISH ABSTRACT: A big passenger transport company experienced problems with the utilization of their maintenance crews. Large amounts of overtime were logged, while at the same time a lot of idle time was experienced. This paper describes the development on a microcomputer of a Decision Support System (DSS) to improve their shift scheduling. Central to the DSS is a heuristic algorithm which generates shift schedules. This algorithm is easy to understand and provides good results, while it solves the real life problem rapidly on a microcomputer.en_ZA
dc.description.abstractAFRIKAANSE OPSOMMING: 'n Groot passasiersvervoermaatokappy het probleme ondervind met die benutting van hulle onderhoudspersoneel. Baie oortyd is gewerk en terselfdertyd is baie ledige tyd opgeteken. Hierdie artikel beskryf die ontwikkeling op 'n mikrorekenaar van 'n Besluitnemingsondersteuningstelsel (BOS) om hulle skofteskedulering te verbeter. Die belangrikste element van die BOS is 'n heuristiese algoritme wat skofteskedules genereer. Hierdie algoritme is maklik om te verstaan en genereer goeie skedules. Terselfdertyd los dit die maatskappy se probleem vinnig op 'n mikrorekenaar op.af_ZA
dc.description.urihttp://sajie.journals.ac.za/pub/article/view/432
dc.description.versionPublisher's versionen_ZA
dc.format.extent12 pagesen_ZA
dc.identifier.citationSinclair, M. & Muller, L. 1990. Shift scheduling for a maintenance workshop. South African Journal of Industrial Engineering, 4(1): 18-29, doi: http://dx.doi.org/10.7166/4-1-432en_ZA
dc.identifier.issn2224-7890 (online)
dc.identifier.issn1012-277X (print)
dc.identifier.otherdoi: http://dx.doi.org/10.7166/4-1-432
dc.identifier.urihttp://hdl.handle.net/10019.1/70785
dc.language.isoen_ZAen_ZA
dc.publisherSAIIEen_ZA
dc.rights.holderAuthors retain copyrighten_ZA
dc.subjectPassenger transport -- Maintenanceen_ZA
dc.subjectDecision support systemsen_ZA
dc.subjectMicrocomputers -- Programmingen_ZA
dc.subjectShift systemsen_ZA
dc.titleShift scheduling for a maintenance workshopen_ZA
dc.typeArticleen_ZA
Files
Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Sinclair_shift_1990.pdf
Size:
865.5 KB
Format:
Adobe Portable Document Format
Description:
Download article
License bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
license.txt
Size:
1.95 KB
Format:
Item-specific license agreed upon to submission
Description: