Browsing by Author "Malherbe, Johannes Louw"
Now showing 1 - 2 of 2
Results Per Page
Sort Options
- ItemLeierskapstyl en bestuursdoeltreffendheid : 'n opvolgstudie en uitbreiding van die Fiedler-model(Stellenbosch : Stellenbosch University, 1973) Malherbe, Johannes Louw; Stellenbosch University. Faculty of . Dept. of .
- ItemScheduling program based on the theory of constraints(Stellenbosch : Stellenbosch University, 2003-03) Malherbe, Johannes Louw; Bartel, K. J.; Stellenbosch University. Faculty of Engineering. Dept. of Industrial Engineering.ENGLISH ABSTRACT: The goal of this thesis is to provide a stepping-stone for the design and development of a software package that implements the Goal System Algorithm, based on the Theory of Constraints (TOC). This includes the complete description and explanation of the Goal System Algorithm (GS), as well as the partial implementation of this algorithm using Microsoft Access as a Database Management System (DBMS) and Microsoft Visual C++ as programming language. The main development effort was put into the development of a scheduling algorithm and the implementation of a data structure that lies at the core of this algorithm. The reason for the development of such a package is that it will aid a production manager, working in a small to medium size job-shop, in generating a schedule for production that will increase throughput, while simultaneously reducing both inventory and operating expense thereby generating profits and cash flow. With regard to this thesis and the overall project goal the following have been achieved. 1. The complete project has been researched, scoped and each step has been explained. 2. The complete program structure has been defined and broken into two separate modules; the Data Mining and Conversion Module and the TOC Scheduling Algorithm. 3. The database containing all the MRP data necessary for scheduling has been designed and implemented using a MS Access database with an ODBC connection. An ODBC connection to the database was used so that a smooth transmission to other database management systems can be made. 4. The TOC Scheduling Algorithm has been developed and the following have been implemented: • A basic user interface has been created for the insertion of all the user input and to display the constraint schedule. • A data structure called a linked list has been developed and used to store the scheduling data in memory. • The complete GS algorithm had been researched and explained. • The GS algorithm has been and implemented and tested up to the point where it schedules the constraint. • The pseudo code for the part of the GS algorithm that was not implemented has been documented and included in this report. More development needs to be done and a proper Graphical User Interface must also be created to complete this project, but after completion a Toe software package will exist that is completely unique in South Africa and the market potential for this package will be considerable.